Umicore plant, Radzikowice near Nysa — 110 kV GIS switchgear and 20 kV primary circuits
electrical installation works covering the 20 kV primary circuits, stages W2A and W2B
Design and construction work for distribution network operators, industrial plants, property developers and public investors. Every entry comes from the company’s own records or from a client reference letter.
12 entries

electrical installation works covering the 20 kV primary circuits, stages W2A and W2B

dismantling of the existing power installation
management of the entire electrical and power infrastructure of the factory
design documentation and construction under the design-and-build model
maintenance work on a customer transformer substation
removal of a power network clash
reconstruction of the power infrastructure at 3D Dostawcza St. in Łódź
LV 0.4 kV power supplies
reconstruction of the plant's power supply
design of low-voltage installations
construction of a pole-mounted MV/LV transformer substation with a 400 kVA transformer
design and construction of MV/LV 15/0.4 kV infrastructure on a turnkey basis