Production plant in Ozorków — MV/LV container substation and 15 kV MV cable line

Client
JOKA Sp. z o.o.
Sector
industry
Location
Ozorków
Role
design and construction
Year
2018

Power supply for the Greiner Real Estate Sp. z o.o. production plant in Ozorków, carried out for JOKA Sp. z o.o. under the design-and-build model. The scope covered the design and construction of an MV/LV container transformer substation with a 1600 kVA transformer, together with a 15 kV MV cable line 730 m long. The line route was executed using drilled crossings under roads.

Scope

  • design documentation and construction under the design-and-build model
  • construction of an MV/LV container transformer substation with a 1600 kVA transformer
  • construction of a 15 kV MV cable line, 730 m long
  • drilled crossings under roads along the cable line route

Key parameters

  • Transformer rating: 1600 kVA
  • MV cable line voltage: 15 kV
  • MV cable line length: 730 m