Production plant in Ozorków — MV/LV container substation and 15 kV MV cable line
- Client
- JOKA Sp. z o.o.
- Sector
- industry
- Location
- Ozorków
- Role
- design and construction
- Year
- 2018
Power supply for the Greiner Real Estate Sp. z o.o. production plant in Ozorków, carried out for JOKA Sp. z o.o. under the design-and-build model. The scope covered the design and construction of an MV/LV container transformer substation with a 1600 kVA transformer, together with a 15 kV MV cable line 730 m long. The line route was executed using drilled crossings under roads.
Scope
- design documentation and construction under the design-and-build model
- construction of an MV/LV container transformer substation with a 1600 kVA transformer
- construction of a 15 kV MV cable line, 730 m long
- drilled crossings under roads along the cable line route
Key parameters
- Transformer rating: 1600 kVA
- MV cable line voltage: 15 kV
- MV cable line length: 730 m