GROT meat processing plant, Starowa Góra — 0.4 kV LV power supply in emergency mode
- Client
- Zakład Przetwórstwa Mięsnego „GROT” J. Grot sp.j.
- Sector
- industry
- Location
- Starowa Góra
- Role
- contractor
- Year
- 2017
The reconstruction of the power supply at the meat processing plant in Starowa Góra covered the section between the transformer substation and the main switchgear. New 0.4 kV LV cable lines were built along this route. The works were carried out in emergency mode. The project dates from 2017.
Scope
- reconstruction of the plant's power supply
- construction of new 0.4 kV LV cable lines from the transformer substation to the main switchgear
- execution of the works in emergency mode
Key parameters
- cable line voltage: 0.4 kV (LV)
- execution mode: emergency