VERDENT, Łódź, Śląska Street — MV/LV power supply for a production plant
- Client
- VERDENT Sp. z o.o.
- Sector
- industry
- Location
- Łódź, ul. Śląska
- Role
- contractor
The task covered the construction of the electricity supply for a production plant on Śląska Street in Łódź. The supply is based on a pole-mounted MV/LV transformer substation with a 400 kVA transformer, fed by a 15 kV MV cable line, together with a 0.4 kV LV switchgear. The scope was completed with metering systems and cooperation instructions.
Scope
- construction of a pole-mounted MV/LV transformer substation with a 400 kVA transformer
- construction of a 15 kV MV cable line
- construction of a 0.4 kV LV switchgear
- installation of metering systems
- preparation of cooperation instructions
Key parameters
- Transformer: 400 kVA
- MV voltage: 15 kV
- LV voltage: 0.4 kV