Rebuilding of the production and warehouse areas and the staff facilities of the plant at ul. Papiernicza 1 in Łódź, carried out between 2022 and 2024 to adapt the building to new assembly lines. After the existing installation was dismantled, power supply was built for the halls, machines, production lines and robots, based on departmental switchgear and high-power busbar trunking. The scope also included lighting installations, rebuilding of the fire alarm system and installations in the changing rooms and testing laboratories.

Scope

  • dismantling of the existing power installation
  • supply and installation of departmental switchgear and high-power busbar trunking
  • construction of cable routes and laying of supply cables to hall switchgear, machines, production lines and robots
  • construction and rebuilding of general, emergency and escape lighting
  • rebuilding of the fire alarm system
  • electrical installations for staff facilities, changing rooms and washing machine testing laboratories