ARTCEM Tępiński i Wspólnicy, Łódź — power network clash removal with an MV/LV substation

Client
„ARTCEM Tępiński i Wspólnicy” Spółka Jawna
Sector
industry
Location
Łódź
Role
contractor
Year
2022

The project carried out in Łódź covered the removal of a power network clash. The works included construction of a 15/0.4 kV MV/LV transformer substation together with 15 kV MV and 0.4 kV LV cable lines. Energy acted as the contractor, and the scope is confirmed by the client's reference letter from 2022.

Scope

  • removal of a power network clash
  • construction of a 15/0.4 kV MV/LV transformer substation
  • construction of 15 kV MV cable lines
  • construction of 0.4 kV LV cable lines

Key parameters

  • Transformer substation: MV/LV 15/0.4 kV
  • MV cable lines: 15 kV
  • LV cable lines: 0.4 kV