Kuczyna HV/MV substation — new HV bay for the Krobia-Pępowo wind farm
excavation and foundations for 110 kV apparatus
Design and construction work for distribution network operators, industrial plants, property developers and public investors. Every entry comes from the company’s own records or from a client reference letter.
18 entries

excavation and foundations for 110 kV apparatus
removal of a clash with the existing MV 15 kV overhead line at ul. Antonówka in Tuszyn
design documentation for the modernization of the MV and LV networks on Barlickiego Street
design documentation for the grid connection
construction of an MV/LV transformer substation
construction of an MV/LV transformer substation, type MRw-bpp 20/1000-4
construction of an MV/LV transformer substation, type MRw-b 20/630-4
construction of an LV cable connection in Niesułków
design documentation for the connection of the production plant
reconstruction of the MV cable line on the Starorudzka 14/16 – Przewodnia 11a route in Łódź
reconstruction of an MV cable line between substation No. 50858 at Narutowicza 137a St. and MV cable connection cabinet No. 54104 at Konstytucyjna 2 St.
reconstruction of the MV cable line between RPZ Dąbrowska and substation no. 51103 at ul. Doroszewskiego 4a
reconstruction of the MV cable line between substation no. 22071 at ul. Wilanowska 33A and substation no. 22158 at ul. Nowogrodzka 37A
construction of an MV cable connection cabinet (ZKSN)
design and cost-estimate documentation for the change of supply voltage from 6 kV to 15 kV
design and cost estimate documentation for an MV cable line and MV cable connection cabinet for the connection of a production plant in Piaski Bankowe
design documentation for the power engineering works
upgrade of the LV overhead line in Łódź in the area of Przyrodnicza and Chabrowa streets