PGE Dystrybucja Łódź-Teren, Sieradz Region — cabinet replacement in 15/0.4 kV pole-mounted substations

Client
PGE Dystrybucja S.A. Oddział Łódź-Teren
Sector
distribution networks
Location
Tymienice (Szadkowice), Wola Stryjewska (Wilamów)
Role
design and construction
Year
2015

The task was carried out in the distribution network of PGE Dystrybucja S.A., Łódź-Teren Branch, within the area of the Sieradz Power Region. It covered the preparation of design documentation and the execution of power engineering works consisting of the replacement of substation cabinets. The works were performed on 15/0.4 kV pole-mounted substations in two locations: Tymienice (Szadkowice) and Wola Stryjewska (Wilamów).

Scope

  • design documentation for the power engineering works
  • replacement of substation cabinets in 15/0.4 kV pole-mounted transformer substations
  • works in the villages of Tymienice (Szadkowice) and Wola Stryjewska (Wilamów)

Key parameters

  • Substation voltage: 15/0.4 kV
  • Substation type: pole-mounted