Kuczyna HV/MV substation — new HV bay for the Krobia-Pępowo wind farm
- Client
- ELEKTROTIM S.A.
- Sector
- distribution networks
- Location
- stacja WN/SN Kuczyna
- Role
- contractor
- Year
- 2025
Modernisation of the Kuczyna HV/MV substation carried out for ELEKTROTIM S.A. The work consisted of adding an HV bay to connect the Krobia-Pępowo wind farm to the network of Enea Operator Sp. z o.o. Oddział Dystrybucji Poznań. The scope covered the outdoor section of the 110 kV switchgear and the control circuits in the control room.
Scope
- excavation and foundations for 110 kV apparatus
- installation of 110 kV outdoor switchgear apparatus
- installation of prefabricated control cabinets in the control room
- laying of control cables
- installation of connections and busbars
Key parameters
- voltage: 110 kV
- switchgear: 110 kV outdoor