Modernisation of the Kuczyna HV/MV substation carried out for ELEKTROTIM S.A. The work consisted of adding an HV bay to connect the Krobia-Pępowo wind farm to the network of Enea Operator Sp. z o.o. Oddział Dystrybucji Poznań. The scope covered the outdoor section of the 110 kV switchgear and the control circuits in the control room.

Scope

  • excavation and foundations for 110 kV apparatus
  • installation of 110 kV outdoor switchgear apparatus
  • installation of prefabricated control cabinets in the control room
  • laying of control cables
  • installation of connections and busbars

Key parameters

  • voltage: 110 kV
  • switchgear: 110 kV outdoor