VERDENT, Łódź — turnkey MV/LV 15/0.4 kV power supply for a production plant

Client
VERDENT Sp. z o.o.
Sector
industry
Location
Łódź, ul. Starorudzka 10/12
Role
design and construction

The power supply for the production plant at ul. Starorudzka 10/12 in Łódź was delivered on a turnkey basis, from design through construction on site. The scope covered a 15 kV MV cable line and a two-transformer substation with two 1000 kVA transformers, a 5-bay 15 kV MV switchgear and two 0.4 kV LV switchgear assemblies. The 0.4 kV LV distribution runs from the transformers through the switchgear assemblies to the production machinery. Metering systems and interoperation instructions were also prepared.

Scope

  • design and construction of MV/LV 15/0.4 kV infrastructure on a turnkey basis
  • construction of a 15 kV MV cable line
  • construction of a two-transformer substation with two 1000 kVA transformers
  • installation of a 5-bay 15 kV MV switchgear and two 0.4 kV LV switchgear assemblies
  • installation of metering systems and preparation of interoperation instructions
  • construction of 0.4 kV LV cable lines between the transformers, LV switchgear assemblies and production machinery

Key parameters

  • Voltages: 15 kV / 0.4 kV
  • Transformers: 2 x 1000 kVA
  • MV 15 kV switchgear: 5 bays
  • LV 0.4 kV switchgear assemblies: 2