ZIMNY Auto, Łódź — rebuild of 15 kV MV and 0.4 kV LV networks with a 15/0.4 kV substation

Client
ZIMNY Auto Sp. z o.o.
Sector
retail
Location
Łódź
Role
design and construction

The work covered the rebuild of the existing 15 kV MV and 0.4 kV LV networks and the construction of a 15/0.4 kV transformer substation. It was preceded by technological documentation, including traffic management plans, and by arrangements with the utility network operators. Once the works were finished, as-built documentation with survey records was prepared, acceptance protocols were obtained from PGE Dystrybucja S.A. Oddział Łódź, followed by the occupancy permit / notification of construction completion.

Scope

  • rebuild of the 15 kV MV and 0.4 kV LV networks
  • construction of a 15/0.4 kV transformer substation
  • technological documentation, including traffic management plans
  • arrangements with utility network operators
  • as-built documentation with survey records
  • acceptance protocols from PGE Dystrybucja S.A. Oddział Łódź
  • obtaining the occupancy permit / notification of construction completion

Key parameters

  • MV network voltage: 15 kV
  • LV network voltage: 0.4 kV
  • transformer substation: 15/0.4 kV