Perfectum Development, Łódź, 11/13 Wodna Street — rebuilding of the power infrastructure
- Client
- Perfectum Development Sp. z o.o.
- Sector
- residential
- Location
- Łódź, ul. Wodna 11/13
- Role
- contractor
Rebuilding of the existing power infrastructure at 11/13 Wodna Street in Łódź. The works covered the relocation of clashing MV 15 kV and LV 0.4 kV cable lines together with the indoor MV/LV 15/0.4 kV transformer substation, followed by rebuilding the infrastructure at a new location. Supply was restored using a containerised MV/LV 15/0.4 kV transformer substation, cable ducting and new MV and LV cable lines.
Scope
- relocation of clashing MV 15 kV and LV 0.4 kV cable lines
- relocation of the clashing indoor MV/LV 15/0.4 kV transformer substation
- supply and installation of a containerised MV/LV 15/0.4 kV transformer substation
- construction of cable ducting
- construction of MV 15 kV and LV 0.4 kV cable lines
Key parameters
- Voltages: MV 15 kV, LV 0.4 kV
- Substation removed: indoor MV/LV 15/0.4 kV
- Substation rebuilt: containerised MV/LV 15/0.4 kV