Rebuilding of the existing power infrastructure at 11/13 Wodna Street in Łódź. The works covered the relocation of clashing MV 15 kV and LV 0.4 kV cable lines together with the indoor MV/LV 15/0.4 kV transformer substation, followed by rebuilding the infrastructure at a new location. Supply was restored using a containerised MV/LV 15/0.4 kV transformer substation, cable ducting and new MV and LV cable lines.

Scope

  • relocation of clashing MV 15 kV and LV 0.4 kV cable lines
  • relocation of the clashing indoor MV/LV 15/0.4 kV transformer substation
  • supply and installation of a containerised MV/LV 15/0.4 kV transformer substation
  • construction of cable ducting
  • construction of MV 15 kV and LV 0.4 kV cable lines

Key parameters

  • Voltages: MV 15 kV, LV 0.4 kV
  • Substation removed: indoor MV/LV 15/0.4 kV
  • Substation rebuilt: containerised MV/LV 15/0.4 kV