Optimum Property V, Łódź — MV and LV network rebuild with a new transformer substation

Client
Optimum Property V Sp. z o.o.
Sector
retail
Location
Łódź
Role
design and construction

The task covered both design and construction. A temporary substation was installed for the duration of the construction works, and a new 15/0.4 kV transformer substation was built as the permanent solution. Beyond the site works, technology documentation was prepared together with traffic management designs, and arrangements were made with the utility network operators. The project closed with as-built documentation including surveying and acceptance protocols from PGE Dystrybucja S.A. Oddział Łódź.

Scope

  • rebuild of the 15 kV MV and 0.4 kV LV networks
  • installation of a temporary substation for the duration of the construction works
  • construction of a new 15/0.4 kV transformer substation
  • technology documentation and traffic management designs
  • arrangements with utility network operators
  • as-built documentation with surveying and acceptance protocols from PGE Dystrybucja S.A. Oddział Łódź

Key parameters

  • MV network voltage: 15 kV
  • LV network voltage: 0.4 kV
  • Transformer substation: 15/0.4 kV