GROT Meat Processing Plant, Starowa Góra — PV farm connection and 15 kV MV supply line

Client
Zakład Przetwórstwa Mięsnego „GROT” Sp. z o.o.
Sector
renewable energy
Location
Starowa Góra
Role
contractor
Year
2023

The work covered connecting two photovoltaic installations of 650 kWp each to the production plant installation, together with modernisation of the power substations. A separate part of the scope was participation in building a 3.6 MWp PV farm with a 2x2 MW transformer substation and construction of an electricity supply connection using a 15 kV MV cable line 3.4 km long.

Scope

  • connection of two PV farms of 650 kWp each to the production plant installation
  • modernisation of the plant's power substations
  • participation in the construction of a 3.6 MWp PV farm with a 2x2 MW transformer substation
  • construction of an electricity supply connection using a 15 kV MV cable line 3.4 km long

Key parameters

  • PV farm capacity: 2 x 650 kWp
  • PV farm capacity: 3.6 MWp
  • Transformer substation: 2x2 MW
  • Connection: 15 kV MV cable line
  • Connection length: 3.4 km