GROT Meat Processing Plant, Starowa Góra — PV farm connection and 15 kV MV supply line
- Client
- Zakład Przetwórstwa Mięsnego „GROT” Sp. z o.o.
- Sector
- renewable energy
- Location
- Starowa Góra
- Role
- contractor
- Year
- 2023
The work covered connecting two photovoltaic installations of 650 kWp each to the production plant installation, together with modernisation of the power substations. A separate part of the scope was participation in building a 3.6 MWp PV farm with a 2x2 MW transformer substation and construction of an electricity supply connection using a 15 kV MV cable line 3.4 km long.
Scope
- connection of two PV farms of 650 kWp each to the production plant installation
- modernisation of the plant's power substations
- participation in the construction of a 3.6 MWp PV farm with a 2x2 MW transformer substation
- construction of an electricity supply connection using a 15 kV MV cable line 3.4 km long
Key parameters
- PV farm capacity: 2 x 650 kWp
- PV farm capacity: 3.6 MWp
- Transformer substation: 2x2 MW
- Connection: 15 kV MV cable line
- Connection length: 3.4 km