Work on the plot in Łódź at the corner of Kilińskiego Street and Piłsudskiego Avenue involved removing a utility clash by rebuilding the existing 15 kV MV, 6 kV MV and 0.4 kV LV cable lines. The scope covered the construction and detailed design and obtaining the administrative decisions. The works were carried out under archaeological supervision.
Scope
- construction and detailed design for the rebuild of the power infrastructure
- obtaining administrative decisions
- utility clash removal on the plot at the corner of Kilińskiego Street and Piłsudskiego Avenue
- rebuild of 15 kV MV, 6 kV MV and 0.4 kV LV cable lines
- archaeological supervision
Key parameters
- Cable lines: 15 kV MV, 6 kV MV, 0.4 kV LV
- 15 kV MV cable: approx. 1140 m
- Value of works: over PLN 500,000 gross