Archicom Polska, Łódź — utility clash removal and undergrounding of an MV line on Rąbieńska Street

Client
Archicom Polska S.A.
Sector
residential
Location
Łódź, ul. Rąbieńska / Cieplarniana
Role
design and construction
Year
2021

The task at Rąbieńska/Cieplarniana Street in Łódź involved the removal of clashing power utilities. The MV line was put underground over a length of 410 m, with the pole structures replaced. The work was carried out under a design-and-build contract covering both design and construction.

Scope

  • removal of clashing power utilities at Rąbieńska/Cieplarniana Street in Łódź
  • undergrounding of an MV line over a length of 410 m
  • replacement of pole structures
  • delivery under a design-and-build contract — design and construction

Key parameters

  • Length of undergrounded MV line: 410 m
  • Delivery model: design and build

Project photographs